Canntech_Logo_22-removebg-preview

National Maritime Museum, Lothal

client summary

A first of its kind complex in India, this centre will showcase India’s rich and diverse maritime heritage. The National Maritime Complex would employ engaging and immersive communication, revealing spaces, and interactive technology. It will house a meaningful combination of the traditional and contemporary formats of storytelling. The narrative style of experiential space design would attract, engage and enrol audiences of all ages and backgrounds. Layered content will provide scope for both short and long visits.

Scope and realisations

• Develop a full 3D BIM model based on architectural and MEPF designs.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.
• Development of the BIM Modeling standards and guidelines which should be followed during the project execution.

ADDRESS HOTEL, DUBAI

client summary

The Hotel &Residential Development is comprised of 64 storey tower, which sits tall over a distinct 5 storey podium base (B3+G+M+4 Podiums) which acts as the base for the tower. The health club level houses the swimming pool, gymnasium, landscaped gardens with an exclusive jogging track and health & leisure facilities. The parking, inclusive of visitors parking, is distributed throughout the mezzanine and 4 podium levels for the Hotel & Residents benefit.

Scope and realisations

• Develop a MEPF 3D BIM model based on MEP designs.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.
• Comprehensive design review analyses in order to minimize the risk of changes in the project that may result in additional expenses for the owner.
• Preparation of Bid packages by developing quantity takeoffs extracted from 3D BIM model using our software solutions.
• Use this model for construction monitoring with an on-site monitoring team.

AIIMS, NEW DELHI

client summary

Aimed at developing the All India Institute of Medical Sciences (AIIMS), Delhi as a “world-class medical university”, the Delhi Development Authority (DDA) on redevelopment plan that includes a host of facilities and renovation projects for the institute. So that the goal of developing AIIMS into a world-class Medical University by March 2024 can be achieved without any failure. The master plan aims to re-develop AIIMS Delhi infrastructure in a holistic manner by consolidating patient care teaching research and administration in the East Ansari Nagar campus. Following Building Canntech is doing BIM Modeling: Academic Research Clinical (ARC) Building, Logistics Centre, Core Research Facility.

Scope and realisations

• Develop a full 3D BIM model based on architectural, steel structural and MEPF designs.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.
• Extracting and developing coordination shop drawings from 3D BIM model
• The process of clash detection along with clash reports was aligned with 3D BIM model development in order to avoid any construction delays and improve design.
• The 3D BIM model will used for generating 4D construction simulations which enabled effective schedule planning and optimization.
• Preparation of Bid packages by developing quantity takeoffs extracted from 3D BIM model using our software solutions.

DUBAI METRO

client summary

A major expansion of the Dubai Metro Red Line to add 15 kilometers of track and extend it from Ibn Battuta to the Expo 2020 site. ‘Route 2020’ project starts off on the Red Line and extends 15 km with four stations – 3 elevated and 1 underground.

Scope and realisations

• Developing a full-detail 3D BIM model- Architecture, Structure and MEPF.
• Coordinated Model with Architecture, Structure and MEPF.
• The process of clash detection along with clash report.
• The 3D BIM model was used for generating 4D construction simulations.

BAHA HOSPITAL

client summary

Baha Hospital is a medical complex located 30 kilometers west of Al Baha City.Major departments include: Accident and Emergency with Helipad on the roof and separate Adult and Pediatric treatment areas; over 20 Outpatient Clinics; Outpatient Procedures including Endoscopy, Pulmonary and Cardiology; Radiology and Nuclear Medicine; Same Day Medical observation unit; a modern Surgical suite with 20 OR’s including 2 hybrid rooms; a Women’s Center including Women’s Inpatient beds include Adult, Pediatric and Women’s Center beds as well as 12 unique ICU bed units and 32OT with total 650 bed.

Scope and realisations

• Develop a full 3D BIM model based on architectural, structural and MEP designs.
• Construction monitoring with on-site monitoring team.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.

OCC BUILDING, LUCKNOW METRO

client summary

The Operations Control Centre (OCC) is responsible for a smooth command and control of all stations and trains. The video wall will display dynamic status of each train, route and signal on a real-time basis and the status of the power supply on each section of the line. Faults in the supply, if any, will be noticed immediately through the Video wall and can be acted upon by the LMRC operators. The operations of the fastest built metro project will be monitored round the clock on Delta’s Video walls in support of train services and maintenance activities.

Scope and realisations

• Develop a full 3D BIM model based on architectural, structural and MEP designs.
• Construction monitoring with on-site monitoring team.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.

MADIPUR HOSPITAL

client summary

Madipur hospital in Madipur, New Delhi is under construction which will be provided with 690 beds includes a full range of services and will function as a Trauma Center. These locations have been selected given their high population density and lack of government hospital facility in proximity. It contains Car Park 2 basement with Ground Floor and 10 Levels.

Scope and realisations

• Develop a MEPF 3D BIM model based on MEP designs.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.
• Comprehensive design review analyses in order to minimize the risk of changes in the project that may result in additional expenses for the owner.

PUNA METRO

client summary

Frist Underground Metro Station from Northern end of North South Corridor under package 1 is Shivaji Nagar UG Station. Station is constructed with typical cut & cover method consisting of platform level, concourse level and Grade level. Shivajinagar UG Station is shifted along the Station length by 35mts towards Southern side and partly moved in to the MSRTC land, improving the traffic management at Shivaji Road.

Scope and realisations

• Develop a full 3D BIM model based on architectural, structural and MEP designs.
• Construction monitoring with on-site monitoring team.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.

ETISALAT DATA CENTER, ABU DHABI

client summary

Etisalat Data Center Design services were requested for the client site located in Zayed Military City, Abu Dhabi, United Arab Emirates. The current plot will cater for a single-storey data center consisting 36 MW IT loads constructed in 6 phases and provision for a future data center expansions expected to reach a total of 100 MW. Each phase is constructed with 6 MW IT load.

Project highlights: • The IT rack load density is considered as 20kW. • 2,280 TR load catered through air cooled chillers for each phase (excluding standby) • Cooling through in-row cooling units & Fan-walls for IT equipment • Cooling through CRAH & CRAC for electrical equipment

Scope and realisations

• Develop a full 3D BIM model based on architectural, structural and MEP designs.
• Construction monitoring with on-site monitoring team.
• Keep the model up-to-date and run regular constructability analyses in order to detect and resolve conflicts among structural, architectural and MEP elements.